罗马尼亚求购浮动船坞
日期:2010-05-12

Hi,
My name is Adriana Saavedra Gonzalez and im interesting to buy a floating dock like it is down, to be one old, no new .
If you can make me a offert i will be greatfull.

Best rigards,
Adriana Saavedra Gonzalez

Skype : selmarv.personal

 

 

Specifications for a floating dock
N°ITEMSSPECIFICATIONS
1Principal DimensionsOverall length : ≤120 m Length B P : 110 m
Breadth over all max : ≤32 m
Clear width between fenders : 26 m
Depth of pontoon : ≤3,2 m
Depth of keel blocks : 1,20 m
2Lifting capacityFrom 5000 to 8000 tons
3Hull ConstructionThe structural part of the dock mainly consists of a continuous steel caisson and two completely closed side wings
The caisson deck will be extended at both ends by a working platform Wings should have :
Fresh water tank : 25 m3
Washing water tank : 25 m3
Gas oil tank : 60 m³
Sewage tank : 25 m3
4PumpingTime for deballasting with boat on dock should be at most 60 min
Ballast pump: 2100 m³/h, 50kw
Pump rooms should be sealed and should have acces for easy intervention from the security deck.
3 sets of emergency submerged pumps
Hydraulic valves with distant command and cross over pipe line
2 Incorporated cooling pumps; 40kw
5ImpellersImpellers should be made of bronze or stainless steel
6Greasing of pump sheftIt should be done at 4 points :
two on shaft
two on pump impeller
7Hydraulics If valves are to be opened hydraulically, pipes should be made of stainless steel and pipes from pressure unit to valves should be arranged in such a way that fault tracing should be easy
8Cranes2 Jib cranes or gantry with lifting capacity of 15 t
Fit load and distance indicator and alarm
9Mooring equipmentThe dock will be equipped with 4 electric capstans
Bollards and fairleads will be installed on each upper deck.
10Compressors2 air cooled compressors of about 250kw and 8,5 bars pressure
11High pressure washing pumps2 high pressure pumps of 500 bars with water storage tanks on island below service tunnels
12Fire pump200m³/h, 50m head, 40Kw
13ProtectionCathodic protecting system should be installed
14ElectricityTransformer supply of ships :
3ph:380/220, 50hz - 3ph:220/127v - sn : 320kva
Power converter 440 v 60 Hz
Phase indicator
3 distribution points on top each upper deck
2 Incorpored stand by electric generators 500 kva
The line for 440v 60Hz should be located in the dock from production point to distribution point
Dock should be in such a way that electrical cables come out only at distribution points
Pipes of about 140mm diameter should be fitted near distribution points for passage of cables. As scoppes pipes with cover at one end
16Control roommonitoring screen (pumps room, stores, workshops, main posts)
Interphone system
Radio and speakers in the post with equipment
Fire dictating system
Ballasting and deballasting control panel
Alarm communication system
17Pipe workDistribution line for high pressure water with valves at the end
Distribution line for air with 6 outlet valves at the end
Lines for cooling of ships
18FacilitiesEquipped workshops with machine tool: Lathe machine,counter, drilling machine, press 100 T, etc.
Dressing room and toilets
Stores
Bathroom
Equipped and air conditionned offices
Conference room

Optional Information
- HS Code : 8908 Vessels and Other Floating Structures for Breaking Up

  • 易出口--全球买家找上门!
】 【打印
关于国外买家求购信息
2010-05-12 罗马尼亚求购浮动船坞
2010-05-12 土耳其求购不锈钢
2010-05-12 波兰求购药丸
2010-05-06 乌克兰求购油产品
2010-05-04 巴基斯坦求购节能灯
2010-05-04 越南求不锈钢
2010-05-04 南非求购木炭和煤球
2010-05-04 瑞典求购T袖
2010-05-04 尼日利亚求购硬纸板
2010-04-23 越南求购封装机
相关关键词
 B B  颜料黄  sa ety shoes  porcelain  B B电子